JA Medicare - шаблон joomla Создание сайтов

Jabatan Fungsional:
Lektor

 

Fokus Kepakaran (Expertise):
Construction Management, - Infrastructure Management, - Transportation Management

 


Minat Kajian (Field of Interests):

- Construction Management, - Infrastructure Management, - Transportation Management

 


 

Profil Singkat (Brief Profile):

 

Ade Asmi mendapat pendidikan Strata 1 (S1) Teknik Sipil pada tahun 1994 di Universitas Indonesia, kemudian bekerja sebagai Engineer di Project Management Consultant untuk roll-out project merger Bank pada tahun 1999 (saat ini PT. Bank Mandiri Tbk). Kemudian melanjutkan pendidikan di peringkat Master (S2) Teknik Sipil di Universiti Sains Malaysia dan bekerja sebagai Research Officer selama 3 tahun di Highway and Transportation Engineering Centre untuk projek Highway Capacity Manual Malaysia. Pada tahun 2003 bekerja sebagai Research Officer di Construction Technology and Management Centre (CTMC) untuk projek penelitian di bidang Construction Management. Selama kurang lebih 4 tahun di CTMC, mendapat berbagai pelatihan di bidang Knowledge Management, Health and Safety Environment dan Quality Management System. Pada tahun 2004 melanjutkan studi ke peringkat PhD (S3) di bidang Manajemen Konstruksi Universiti Teknologi Malaysia dan Setelah dari CTMC, Ade Asmi bekerja sebagai Construction Engineer untuk Fabricator Project di Johor, Malaysia. Setelah mendapatkan PhD (S3) pada 2008, Ade Asmi melanjutkan karir menjadi dosen di beberapa University College di Malaysia seperti Lagenda Groups of Colleges dan Inti International University College. Pada tahun Oktober 2008 hingga Oktober 2011 menjadi Dosen Senior (Senior Lecturer) di Civil and Environmental Engineering Department, Universiti Tun Hussein Onn Malaysia (UTHM). Pada Universitas yang sama (UTHM) juga menjabat sebagai Ketua Laboratorium untuk Building Services Laboratory and Building Construction Laboratory. Pada Tahun 2009 mendapat sertifikasi sebagai Lead Auditor untuk OHSAS 18001:2007-Occupational Health and Safety Management Systems Lead Auditor(IRCA course certification) dan tahun 2011 mendapat sertifikasi sebagai Internal Auditor untuk ISO 9001:Quality Management System. Ade Asmi juga membuat beberapa penulisan penelitan yang telah di publikasikan di beberapa International Conference dan International Journal. Saat ini (November 2011-present) Ade Asmi menjabat sebagai Ketua Program Studi (Kaprodi) Teknik Sipil di Universitas Bakrie, Jakarta, Indonesia.

 

Pendidikan (Education):

 

Aug 2004-April 2008 Doctor of Philosophy, Construction Management in Civil Engineering Universiti TeknologiMalaysia
2000-2003 Master of Science in Civil Engineering Universiti Sains Malaysia
1994-1999 ST- Department of Civil Engineering, Universitas Indonesia, Indonesia.

 

ARTIKEL ILMIAH (SCIENTIFIC ARTICLES)

 

Journals

 

Factors affecting construction cost in Mara large construction project: perspective of project management consultant
AH Memon, I Abdul Rahman, MR Abdullah, AA Abdu Azis
International Journal of Sustainable Construction Engineering and Technology ...
44 2011
Preliminary study on causative factors leading to construction cost overrun
AH Memon, I Abdul Rahman, AA Abdul Azis
International Journal of Sustainable Construction Engineering and Technology ...
34 2011
Time and cost performance in construction projects in southern and central regions of Peninsular Malaysia
AH Memon, IA Rahman, AAA Azis
International Journal of advances in applied sciences 1 (1), 45-52
27 2012
Causes of delay in MARA management procurement construction projects
MR Abdullah, IA Rahman, AAA Azis
Journal of Surveying, Construction and Property 1 (1), 123-138
22 2010
Potential effects on large mara construction projects due to construction delay
MR Abdullah, AA Abdul Azis, I Abdul Rahman
International Journal of Integrated Engineering 1 (2)
15 2011
Time overrun in construction projects from the perspective of Project Management Consultant (PMC)
AH Memon, I Abdul Rahman, MR Abdullah, A Aziz, A Asmi
Journal of Surveying, Construction and Property (JSCP) 2 (1)
13 2011
Assessing the effects of construction delays on MARA large projects
AH Memon, IA Rahman, MR Abdullah, AAA Azis
International Journal on Advanced Science, Engineering and Information ...
12 2011
Causes of delay and its effects in large MARA construction project
MR Abdullah, AA Abdul Azis, I Abdul Rahman
International journal of Integrated Engineering (Issue on Mechanical ...
12 2009
Factors affecting construction cost performance in project management projects: Case of MARA large projects
AH Memon, IA Rahman, MR Abdullah, AAA Azis
International Journal of Civil Engineering and Built Environment 1 (1)
10 2014
Modeling causes of cost overrun in large construction projects with partial least Square-SEM Approach: Contractor's Perspective
I Abdul Rahman, AH Memon, A Azis, A Asmi, NH Abdullah
Research Journal of Applied Sciences, Engineering and Technology 5 (6), 1963 ...
9 2013
Controlling cost overrun factors in construction projects in Malaysia
AAA Azis, AH Memon, IA Rahman, ATA Karim
Research Journal of Applied Sciences, Engineering and Technology 5 (8), 26212629
8 2013
Identifying construction resource factors affecting construction cost: Case of Johor
AH Memon, IA Rahman, AAA Aziz, VK Ravish, NIM Hanas
Malaysian Technical Universities International Conference on Engineering ...
8 2011
Significant risk factors in construction projects: Contractor's perception
NAA Karim, IA Rahman, AH Memmon, N Jamil, AAA Azis
Humanities, Science and Engineering (CHUSER), 2012 IEEE Colloquium on, 347-350
6 2012
Challenges faced by construction industry in accomplishing sustainablity goals
AAA Azis, AH Memon, IA Rahman, S Nagapan, QBAI Latif
Business, Engineering and Industrial Applications (ISBEIA), 2012 IEEE ...
6 2012
Time and cost performance of costruction projects in southern and cenrtal regions of Penisular Malaysia
IA Rahman, AH Memon, S Nagapan, QBAI Latif, AAA Azis
Humanities, Science and Engineering (CHUSER), 2012 IEEE Colloquium on, 52-57
5 2012
Delay in large MARA construction projects based on project management consultant perspective
MR Abdullah, I Abdul Rahman, A Azis, A Asmi
3 2009
Application of PLS-SEM to Assess the Influence of Construction Resources on Cost Overrun
IA Rahman, AH Memon, NH Abdullah, AAA Azis
Applied Mechanics and Materials 284, 3649-3656
2 2013
Cost management of large construction projects in south Malaysia
AAA Azis, AH Memon, IA Rahman, QBAI Latif, S Nagapan
Business, Engineering and Industrial Applications (ISBEIA), 2012 IEEE ...
2 2012
Assessing causal relationships between construction resources and cost overrun using PLS path modelling focusing in southern and central region of Malaysia
AH Memon, IA Rahman, A Azis, A Asmi
Journal of Engineering and Technology 4 (1)
1 2014
Time and cost performance of construction projects in Southern and Central Regions of Peninsular Malaysia
I Abdul Rahman, AH Memon, S Nagapan, I Latif, QB Alias, A Azis, A Asmi
1 2012
Initial PLS model of construction waste factors
I Abdul Rahman, S Nagapan, A Azis, A Asmi
  2013
Assessing the Effects of construction resources towards cost overrun using PLS Path Modelling
IA Rahman, AH Memon, ATA Karim, AAA Azis
Science Series Data Report 4 (12)
  2012
Significant Risk Factors in Construction Projects: Contractor’s Perception
IA Nur Alkaf Abd Karim, RAH Memmon, N Jamil, AAA Azis